GAS WASTE HANDLING AND B3B3 wasteAccording to the PP. 18
of 1999, is a B3 waste is the residue of a business and or activities
that contain hazardous or toxic and because of the nature and amount or
concentration and or, directly or indirectly, can pollute and corrupt
the environment or endanger life and or environment, health, human survival and other living things.B3
treatment goal is to prevent and control pollution or environmental
damage caused by waste B3 and the restoration of environmental quality
that has been contaminated so according to function again.
From
this it is clear that any activity / activities related to B3, both
producing, collecting, transporting, utilizing, treating and landfilling
B3, should pay attention to aspects of the environment and maintain the
quality of the environment remains in its original state. And
in the event of pollution caused by spilled, runoff and seepage B3
waste, efforts should be made so that optimal environmental quality back
to the original function. B3 waste handling and processing activities include the collection, transportation, use, processing and stockpiling.Handling B3 waste must meet the following requirements:Locations handlingHandling B3 can be done in the location of the waste or the waste off-site. Terms of processing locations in the producing area should:flood-free areas;with a minimum distance of 50 meters of public facilities;Terms of processing locations outside of area producers must:flood-free areas;distance to the main road / highway minimum 150 m or 50 m for the other;distance from the active region and the general activity of a minimum of 300 m;distance from the well waters and a minimum of 300 m;and distance to protected areas (such as: nature reserves, forest reserves) a minimum of 300 m.Handling facilitiesProcessing facilities must implement operating systems, including:facility security systems;prevention system against fire;prevention system against fire;emergency response system;system testing equipment;and employee training.The
entire system must be integrated and become an integral part of the B3
waste considering the type of waste is the waste handled in a small
volume of any major impact on the environment.B3 waste handling before processingEach
B3 waste must be identified and tested in the content analysis in order
to determine the appropriate procedures in the processing of waste. After
tests conducted content analysis, then determined the appropriate
method of waste treatment in accordance with the characteristics and
content of the waste.The results of B3 waste handling and processingIt
has a special place B3 waste disposal that has been processed and
monitoring of landfills in the area for a period of 30 years after the
landfill out of service or closed.
Langganan:
Posting Komentar (Atom)